Education – Building Automation LJB were hired to carry out a building automation project to bring another remote building onto the central BMS system.
Commercial – Chiller replacement LJB carried out the replacement of an out of life cycle chiller. The building was also seeking energy saving initiatives to help reduce their carbon footprint onsite which was taken into consideration when selecting the chiller.
Scope Dilapidation of chilled water system Capacity and size confirmation Procurement selection and review Installation Commissioning Ongoing energy management
CHISOLM INSTITUTE
Education – Pipework diversions LJB carried out some heating hot water pipework adjustments following a tenancy fit out within one of the buildings.
Scope Engineering review Dilapidation of heating hot water pipework Design Construct Commissioning and testing